ADVISORY:
Please be informed that at about 8:55am this morning, there was power interruption in some areas of BGC particularly 7th and 9th Avenues due to an accident caused by a tower crane that accidentally hit the high tension wire at the Alveo construction site along 26th St. cor. 9th Ave., BGC.

Reply · Report Post